Public Health Engineering Department (PHED) of the government of Balochistan is the responsible department for providing access to the safe drinking water in the rural as well as in urban slums of the province. Presently the department is maintaining its data regarding water supply schemes and coverage at provincial as well as at the district.

Mission

We plan, implement and monitor the development of safe drinking water and sewerage projects for all areas of the province. We ensure health of public through supply of safe drinking water, sanitation services and consultations for developing safe healthy practices in daily chores and improving the living environment.

Vision

We envision to see Healthy, Clean and Disease free Baluchistan through sustainable supply of clean drinking water and awareness for Conservation of Drinking Water.

Objectives

The Public Health Engineering Department Balochistan was carved out of Irrigation and Power Department in July, 1987 with the objective to facilitate the rural and urban population of the Balochistan with the potable drinking Water.

The Department is responsible for the following matters:

  1. Potable water management; and monitoring & implementation of the Water Supply Schemes of the department.
  2. Facilitating access of safe drinking water to the general public.
  3. Establishment of sources for drinking water purpose i.e. installation of Tube Wells, construction of galleries/sump wells to surface flow and water treatment system for canal I surface water.
  4. To make available piped water for drinking and household purpose with construction of sound sewerage system.
  5. Setting regulations for technical issues related to the sector.
  6. Planning, design and construction of water filtration plants including operation and maintenance of already completed plants.
  7. Construction and maintenance of Public Health Drinking Water Scheme.
  8. Water Tariff Collection in consultation with Finance Department.
  9. Issuance of Notification for water Rates.
  10. Levying regular taxes which should be increased gradually to generate revenue.
  11. To monitor the implementation of all vertical programmes, Federally Funded Projects, Foreign Aided Projects through its Provincial setup i.e. CE/SE and field implementations.
  12. To introduce and monitor the implementation of water quality standards and quantity control, for its economical and efficient use.
  13. To continue the present practice of disbursement of O&M funds to the lower tiers to ensure smooth operation of Water Supply Schemes.
  14. Adoption of renewable energy to control operation and maintenance.
  15. To monitor the functioning of the existing Electrical and Mechanical Division for drilling and development of Tube Wells.
  16. Protection of water sources from contamination by continuous water treatment, stream pollution control etc.
  17. Public awareness with regard to water conservation by means of campaigns.
  18. To interact with the sister departments to create provision of drinking water regarding construction/design of water reservoirs in order to meet with future requirements of drinking water.
  19. All Service matters of the employees of the Attached Departments, which does not include employees of the Secretariat and except those matters entrusted to Services and General Administration Department or to any other Department.

 

Department Functions

  • Potable water management; and monitoring & implementation of the Water Supply Schemes of the department.
  • Facilitating access of safe drinking water to the general public.
  • Establishment of sources for drinking water purpose i.e. installation of Tube Wells, construction of galleries/sump wells to surface flow and water treatment system for canal I surface water.
  • To make available piped water for drinking and household purpose with construction of sound sewerage system.
  • Setting regulations for technical issues related to the sector.
  • Planning, design and construction of water filtration plants including operation and maintenance of already completed plants.
  • Construction and maintenance of Public Health Drinking Water Scheme.
  • Water Tariff Collection in consultation with Finance Department.
  • Issuance of Notification for water Rates.
  • Levying regular taxes which should be increased gradually to generate revenue.
  • To monitor the implementation of all vertical programmers, Federally Funded Projects, Foreign Aided Projects through its Provincial setup i.e. CE/SE and field implementations.
  • To introduce and monitor the implementation of water quality standards and quantity control, for its economical and efficient use.
  • To continue the present practice of disbursement of O&M funds to the lower tiers to ensure smooth operation of Water Supply Schemes.
  • Adoption of renewable energy to control operation and maintenance.
  • To monitor the functioning of the existing Electrical and Mechanical Division for drilling and development of Tube Wells.
  • Protection of water sources from contamination by continuous water treatment, stream pollution control etc.
  • Public awareness with regard to water conservation by means of campaigns.
  • To interact with the sister departments to create provision of drinking water regarding construction/design of water reservoirs in order to meet with future requirements of drinking water.
  • All Service matters of the employees of the Attached Departments, which does not include employees of the Secretariat and except those matters entrusted to Services and General Administration Department or to any other Department.

Administration Section

This section deals with administrative and general nature matters of the department. Posting, transfer, budget preparation, traveling allowances, medical bills, and grant of leaves etc. are affairs dealt by administration section. The service matters except those entrusted to Services & General Administration department of any member of the staff also fall under purview of this section. All disciplinary actions are taken by this section on complaint against any member of the department in

Chief Engineering Office

The office of Chief Engineer prepares Implementation Plan Matrix, Quarterly Monitoring Reports, Five Year Rolling Plans, Procurement Plans, and formulates sector statistics regarding investments & coverage using Management Information System. New low cost schemes are designed here and those received from other offices of the department across Balochistan are scrutinized technically. Other important tasks being dealt by this office are:

  • Continuous contact with the communities.
  • Social mobilization.
  • Follow up contacts with all the stakeholders.

This office supervises work on Water Supply Schemes, costing more than Rs. 5.000 million, financed under Public Sector Development Program (PSDP), an annual development program of government o Balochistan. Water supply schemes sponsored under specific development packages namely Governor’s Package and Drought Package etc. are also executed under supervision of this office in addition to foreign and federally funded schemes.
Executive

Executive Engineer

Each district has one Executive Engineer. The Executive Engineer offices shoulder responsibility of executing schemes up to Rs.5.000 million under PSDP and other specific development packages. Besides, Executive Engineer offices are responsible for operation and maintenance (O&M) of all water supply schemes. These offices collect water tariff and make arrangements to handover small schemes to the beneficiaries for O&M

Factors involved in Operation & Maintenance of Water Supply Schemes

  • Large geographical area but very low population density.
  • Poverty.
  • Drying up of simple water supply schemes based on open surface well, karezes & springs.
  • Very low priority / meager allocation of financial resources.
  • Illiteracy/lack of awareness of masses to take responsibility of water supply Schemes.
  • Tribal system / rival groups to collectively share the obligation on part of the communities.
  • Continuous depletion of underground water table
  • Lack of required, logistic facilities (vehicles), office buildings and residential buildings to manage development programme.
  • Over exploitation of water sources /schemes due to influx of Afghan Refugees from the last 3 decades.
  • In discriminate use of underground aquifer by the farmers taking advantage of the subsidy provided by the government.
Issues Status
Release of Funds for Electricity Charges of Community Based WSS. More than 600 community based WSS are non-functional,mainly due to non-payment of huge Electricity bills.The Government has announced to clear the electricity dues for which an amount of Rs.280.00 (M) Annually required to make the schemes functional.
Completion of Clean Drinking Water for All Project & Operation and Maintenance of already completed filtration Plants Consequent upon promulgation of the 18th Amendment Provinces have been assigned the responsibility of the completion/O&M of the Project. Rs. 649.00 (M) required
Enhancement in allocation of funds under the Rehabilitation of non-functional WSS In this regard a composite PC-I amounting to Rs.323.000 (M) Already approved but due to very meager allocation the restoration of the water supply schemes have been delayed.The P&D Department may be directed for necessary action.
Allocation of funds for strengthening augmentation of township water supply schemes The Public representatives generally ignore townships schemes in their development programme and such projects therefore, remained unattended . Keeping in view the increasing population and water demand the town ships schemes are under immense pressure and needs immediate action. The scheme may be reflected in PSDP 2012-13.
Allocation of funds for replacement of old / outlived pumping machinery The majority of the schemes constructed during 1992 under SAP Programme being maintained by PHE Department repeatedly suspends due to outlived pumping machinery which cannot be replaced from Non Development Budget. Scheme requested to be reflected in PSDP 2012-13.
Allocation of funds for water scared / sensitive townships i.e Gawadar , Loralai and Hub towns. Identification and exploration of new water potential sites and feasibility studies preferably on surface water source are under progress to cope with the emerging water supply issues. Therefore, allocation for these townships needs to be made in PSDP 2012-13

Chief Engineer North

  • SE Sibi Circles-XENS Ziarat, Dera Bugti, Kohlu, Sibi & Hernai
  • SE Quetta Circle-XENS’ Quetta, Pishin, Killa Abdullah, Noshki & Dalbadin
  • SE Loralai Circle-XENS ‘ Loralai, Musakhail, Barkahn, Killa Saifullah, Sheani & Zhob
  • SDOs at each Tehsil Level

Chief Engineer South

  • SE Khuzdar Circles-XENS Khuzdar, Kalat, Mastung, Lasbela, Kharan, Awaran, Khuskh
  • SE Mehran Circle-XENS’ Kech, Gwadar & Panjgoor
  • SE Naseerabad Circle-XENS ‘ Naseerabad, Jafferabad, Bolan & Jhal Magsi
  • SDOs at each Tehsil Level

Click here to view the image gallery of the Seminar on Water Scarcity In Balochistan held on July 17, 2018

Official email: [email protected]

S. No Designation Contact
1 Secretary Phone No.081-9201160
2 Technical Advisor Phone No.9202394
3 Additional Secretary Phone No. 081-9203656

081-9201936

081-9201677

4 Deputy Secretary (Admin) Phone No.081-9202629
5 Under Secretary (Budget) Phone No.081-9201010
6 Section Officer (Dev:) Phone No.081-9202867
7 Section Officer (General) Phone No.081-9201175
8 Section Officer (I) Admin: Phone No.081-9201342
9 Section Officer (II) Phone No.081-9202867
10 Section Officer (III) Phone No.081-9202862
11 Deputy Director (Claims) Phone No.081-9201585
12 Deputy Director (Audit) Phone No.081-9202058
13 Deputy Director (M.I.S) Phone No.081-9203956
14 System Analyst Phone No.081-9204603

Public Health Engineering Department (Telephone List -Line Offices)
S.NO. Name Designation Telephone # FAX NO.
Mr.Shareef Bangulzai Chief Engineer (North) 081-9211206 081-9211227
Mr.Azam Zarkoon Superinteding Engineer Quetta 081-9211312
1 Mr.Jameel Agha Executive Engineer PHE Division Quetta 081-9201431
2 Mr.Nadeem Executive Engineer PHE Division Pishin 0826-420451
3 Mr.Mohsin Executive Engineer PHE Division K-Abdullah 0826-614666
4 Mr.Imtiaz Executive Engineer PHE Division Chaman  —
5 Mr.Irfan Executive Engineer PHE Division Chagai/Dalbandin 0825-210578 0825-211589
Mr.Ghafoor Marri Superinteding Engineer Loralai 0824-411125
6 Mr.Azmeer Khan Executive Engineer PHE Division Loralai 0824-411125
7 Mr.Hussain Executive Engineer PHE Division Duki 0824-666270
8 Mr.Adnan William Executive Engineer PHE Division Killa Saifullah 0829-504027
9 Mr.Taimoor Executive Engineer PHE Division Zhob 0822-412814 0822-413388
10 Mr.Jabbar Executive Engineer PHE Division Sherani  —
11 Mr.Naseem Executive Engineer PHE Division Barkhan 0829-668242
12 Mr.Nawaz Executive Engineer PHE Division Musakhail 0828-611131 0828-611127
Mr.Nizam u din Jogezai Chief Engineer (South) 081-9211125 081-9211406
Mr.Yar Muhammad Superinteding Engineer Mekran 0852-413467 0852-413093
13 Mr.Khalid Executive Engineer PHE Division Kech/Turbat 0852-413093 0852-413093
14 Mr.Balach Executive Engineer PHE Division Panjgur 0855-641416 0855-641416
15 Mr.Shakeel Baloch Executive Engineer PHE Division Gwadar 0864-210057 0864-210057
Mr.Server Mengal Superinteding Engineer Khuzdar 0848-412065 0848-412523
16 Mr.Saqib Baloch Executive Engineer PHE Division Khuzdar 0848-412523 0848-412523
17 Mr.Arif Shah Executive Engineer PHE Division Mastung 0843-895449 0843-895449
18 Mr.Sohail Ahmed Executive Engineer PHE Division Kalat 0844-210228 0844-210579
19 Mr.Imran Akbar Executive Engineer PHE Division Lasbela 0853-364026 0853-303038
20 Mr.Noor ul Haq Executive Engineer PHE Division Kharan 0847-510697 0847-510234
21 Mr.Changez Executive Engineer PHE Division Awaran 0856-511007 0856-511062
22 Mr.Jameel Executive Engineer PHE Division Wahshuk 0847-520159 0847-520028
23 Mr.Nadir Executive Engineer PHE Division Surab  —
Chief Engineer (Planning & Design) 081-9204009
Mr.Ameer Jan Magsi Superinteding Engineer Naseerabad 0838-711065
24 Mr. Executive Engineer PHE Division Naseerabad 0838-711353
25 Mr.Essa Executive Engineer PHE Division Kacchi 0832-415514 0832-415514
26 Mr.Kazim Executive Engineer PHE Division Kacchi Plain  —
27 Mr.Shakeel Ahmed Executive Engineer PHE Division Jhalmagsi 0837-430009 0837-430147
28 Mr.Shahak Baloch Executive Engineer PHE Division Jaffarabad 0838-510036 0838-510036
29 Mr.Shakrullah Executive Engineer PHE Division Sohbatpur  —
Mr.Abdul Mutlib Superinteding Engineer Sibi 0833-412075
30 Mr.Farrukh Executive Engineer PHE Division Sibi 0833-412075
31 Mr.Hanif Executive Engineer PHE Division Kohlu 0829-667771 0829-667380
32 Mr.Abdid Shah Executive Engineer PHE Division Harnai 0833-520035
33 Mr.Ahtiram Executive Engineer PHE Division Dera Bugti 0835-410533 0835-410378
34 Mr.Hazrat Ali Executive Engineer PHE Division Ziarat 0833-920024 0833-560309
Mr.Shareef Bangulzai Chief Engineer (Purification Plants) 081-9211206 081-9211227
2 Mr.Aftab Ahmed Superinteding Engineer Purification Plants
3 Executive Engineer Purification Plants
Mr.Hamid Rana Managing Director (WASA) 081-9211609 081-9211610
1 Mr.Imran Durrani Chief Engineer (WASA) 081-9211919
081-9211921