About the Urban Planning & Development Department
The Government of Balochistan established the Urban Planning & Development Department on 3rd June, 2008, with the mandate according to Rules of Business 1976), with a vision to take care of long neglected issues of Urban Planning, Development and management of the urban areas of the Province.
Urban Planning is considered all over the world as a necessary function of public sector planning and development agencies, and it cannot achieve its goals and objectives in isolation. In absence of exercising the urban planning functions at Government level, the decay of human settlements may occur that creates a sense of injustice among the society members. Further it makes the situation more complicated for management of towns by the public authorities.
The Government of Balochistan is exercising the urban planning functions through Urban Planning & Development Department for the development of sustainable urban settlements in the province in compliance of Goal No. 11 of Sustainable Development Goals set by the United Nations. Since the urban planning is a dynamic process hence it cannot achieve its goals and objective in absence of a well-designed, coordinated and integrated approach. All the stake holders including the Government Departments, public and private institutions, academia and general public need to be involved in the planning process.
I hope that the urban Planning and Development Department will lead the development of sustainable urban settlements in the province through preparation and implementation of master plans as per its vision and future endeavors.
Urban planning is an activity for managing the use of land and environmental changes, for making provision of community facilities and services, enhancement of environment including transportation as well as for balanced use of land and adequate housing developments.
The urban planning has long been neglected in Balochistan after the independence. During the course of time, various urban problems have been emerged in towns of the province, such as uneven and chaotic development of the towns, development of squatter and slum settlements, inadequate availability of water supply and sanitation facilities to the population, degradation of environment, congestion in the city centers, high land prices, congested transport networks, inadequate health, education and other social facilities for the concerned urban population, difficult management of the settlements for the public authorities etc.
Urban Planning & Development Department was established in year 2008 to take care of long neglected issues of Urban Planning, Development and Management of the urban areas of the Province.
Currently, the Urban Planning & Development Department is engaged in preparation of Master Plans of more than 30 major cities/towns including the capital of Balochistan through its attached arms/subordinate offices i.e. Directorate of Works and Quetta Development Authority (QDA). This activity is supposed to be completed within a period of one year and will provide a clear and comprehensive roadmap for a planned and controlled development and management of major urban settlement of the province.
It is expected that masses of the Balochistan province will be provided with better living facilities and the government authorities will be able to manage the growth of towns in an efficient, effective and economical manner which is a dire need of the time.

Vision
To ensure the best living standards of the common man in Balochistan through providing the finest planning for the emerging towns and to develop civic facilities for the inhabitants of Province.

Mission
Urban Planning & Development Department has a mission to evolve proper planning process, systematic, evaluative, and theoretical investigations towards instituting a mechanism designed to meet instant and potential need for future expansion, rehabilitation and development of Towns.
Objectives
- Land use/Urban Planning
- Planning & Controlling of projects relating to civic facilities
- Town development and housing
- Preparation of Master Plan, outline the Development schemes and Town improvement schemes
Attached Departments
- Directorate of Works, Urban Planning & Development Department
New Zarghoon Road
Phone # 081-9211903
- Quetta Development Authority
5XCR+FW9, Sariab, Link, Quetta, Balochistan
081-9211067
081-9211076
Services
Civic facilities through various development schemes and projects
ONGOING AND COMPLETED SCHEMES OF UP&DD | |||
---|---|---|---|
QUETTA DIVISION | |||
PSDP NO. | PROJECT NAMEÂ | E/COST | REMARKS |
MINORITIES SECTOR | |||
2212 | CONST: OF ADDITIONAL ROOMS,PRAYER HALL AT BOTH LACHHIMINORITY MOHALLA AKHTARMOHAMMAD ROAD, QUETTA. | 40 M | WORK IN PROGRESS |
2213 | CONST: PRAYER HALLADDITIONAL ROOMS ANDREMAINING WORK ATMETHODIST CHURCH,ZARGHOON ROAD, QUETTA. | 30 M | WORK COMPLETED |
URBAN SECTOR | |||
3759 | DEVELOPMENT OF MASTER PLANS OF REMAINING 30 DISTRICTS HQS/ TOWNS AND HUB TOWNS OF BALOCHISTAN
PISHIN, KHANOZAI&JUNGLE PIRALIZAI |
68 | WORK IN PROGRESS |
3783
Z2021.0747 |
CONSTRUCTION OF PARK AT KARKHASA QUETTA (PSDP NO. 3783) | 100.00 M | WORK IN PROGRESS |
3777
Z2021.0521 |
CONSTRUCTION OF SIDE DRAIN & BLACK TOP OF JAN MUHAMMAD ROAD QUETTA PSDP 3777 | 50.00 M | WORK IN PROGRESS |
SPORTS SECTOR | |||
3747
Z2021.2182 |
CONSTRUCTION OF MINI SPORTS COMPLEX AT POLICE COLONY NAWA KILLI QUETTA PSDP NO. 3747 | 32.3 M | CONSTRUCTION PRICE WAS LOW DUE TO WHICH NO BID RECEIVED THEREFORE PC1 NEEDS TO BE REVISED WITH NEW PREMIUM |
3722
Z2021.0523 |
CONSTRUCTION OF FUTSAL AT AKILLI NASARAN PSDP NO. 3722 | 25.190 M | WORK IN PROGRESS |
3713
Z2021.0898 |
ESTABLISHMENT OF GO KART TRACK AND DRAG RACE TRACK FOR QUETTA PSDP NO. 3713 | 200 M | WORK IS STOPPED DUE TO LAND ISSUE |
3709
Z2021.0894 |
ESTABLISHMENT OF FITNESS GYM AT AYUB FOOTBALL STADIUM QUETTA PSDP NO. 3709 | 50 M | WORK IN PROGRESS |
3710
Z2021.0895 |
REHABILITATION OF HALL AT YOUTH DEVELOPMENT CENTER AYUB STADIUM QUETTA PSDP NO. 3710 | 10 M | WORK COMPLETED |
3708
Z2021.0893 |
CONSTRUCTION OF FUTSAL STADIUMS (WITH MULTI SPORTS TURF) 02 NOS IN 32 DISTRICTS (TOTAL 64) PSDP NO. 3708 AT CHAMAN TOWN | 25 M | WORK IN PROGRESS |
3708
Z2021.0893 |
CONSTRUCTION OF FUTSAL STADIUMS (WITH MULTI SPORTS TURF) 02 NOS IN 32 DISTRICTS (TOTAL 64) PSDP NO. 3708 AT KILLA ABDULLAH TOWN | 25 M | WORK IN PROGRESS |
3708
Z2021.0893 |
CONSTRUCTION OF FUTSAL STADIUMS (WITH MULTI SPORTS TURF) 02 NOS IN 32 DISTRICTS (TOTAL 64) PSDP NO. 3708 AT KILLI NOUABAD AT PISHIN | 25 M | WORK IN PROGRESS |
3707
Z2021.0892 |
CONSTRUCTION OF 06 NOS FUTSAL (MULTI SPORTS TURF) GROUNDS IN QUETTA, FUTSAL AT NAWAKILLI | 25 M | WORK IN PROGRESS |
3707
Z2021.0892 |
CONSTRUCTION OF 06 NOS FUTSAL (MULTI SPORTS TURF) GROUNDS IN QUETTA, FUTSAL AT BALOCHITAN DISABLED PERSONS COMPLEX FOR SPECIAL EDUCATION | 25 M | WORK IN PROGRESS |
3707
Z2021.0892 |
CONSTRUCTION OF 06 NOS FUTSAL (MULTI SPORTS TURF) GROUNDS IN QUETTA, FUTSAL AT SARIAB CUSTOM AREA | 25 M | WORK IN PROGRESS |
3707
Z2021.0892 |
CONSTRUCTION OF 06 NOS FUTSAL (MULTI SPORTS TURF) GROUNDS IN QUETTA, FUTSAL AT EASTERN BYPASS | 25 M | WORK IN PROGRESS |
3707
Z2021.0892 |
CONSTRUCTION OF 06 NOS FUTSAL (MULTI SPORTS TURF) GROUNDS IN QUETTA, FUTSAL AT BALELI | 25 M | WORK IN PROGRESS |
3707
Z2021.0892 |
CONSTRUCTION OF 06 NOS FUTSAL (MULTI SPORTS TURF) GROUNDS IN QUETTA, FUTSAL AT GIRLS COLLEGE SATELLITE TOWN QUETTA | 25 M | WORK IN PROGRESS |
3705
Z2021.0890 |
CONSTRUCTION OF THROW BALL GROUND AT AYUB SPORTS COMPLEX QUETTA (PSDP NO. 3705) | 20 M | WORK IN PROGRESS |
3704
Z2021.0889 |
DEVELOPMENT OF SEWERAGE SYSTEM & WAREHOUSE AT AYUB SPORTS COMPLEX QUETTA (PSDP NO. 3704) | 100 M | WORK IN PROGRESS |
3703
Z2021.0888 |
ESTABLISHMENT OF FOOTBALL ACADEMY AT AYUB SPORTS COMPLEX QUETTA (PSDP NO. 3703) | 100 M | WORK IN PROGRESS |
3702
Z2021.0887 |
ESTABLISHMENT OF CRICKET ACADEMY INDOOR & OUTDOOR AT AYUB SPORTS COMPLEX QUETTA (PSDP NO. 3702) PSDP NO. 3702) | 100 M | WORK IN PROGRESS |
3701
Z2021.0886 |
CONSTRUCTION OF MINI SPORTS COMPLEXES IN 12 DENSELY POPULATED DISTRICT INITIALLY (MAIZAI ADDA, KILLA ABDULLAH) PSDP NO. 3701 | 150 M | FUND SURRENDERED DUE TO LAND ISSUES |
3701
Z2021.0886 |
CONSTRUCTION OF MINI SPORTS COMPLEXES IN 12 DENSELY POPULATED DISTRICT INITIALLY ( BARSHORE, PISHIN) | 150 M | FUND SURRENDERED DUE TO LAND ISSUES |
3699
Z2021.1552 |
CONSTRUCTION OF FUTSAL AT KILLI ABDULZAI AGHBERG (PSDP NO. 3699) | 30 M | WORK IN PROGRESS |
3696
Z2021.1554 |
CONSTRUCTION OF FUTSAL AT JANGLE PIRALIZAI (PSDP NO. 3696) | 30 M | WORK IN PROGRESS |
KALAT DIVISION | |||
PSDP NO | Name of Scheme | Approved Cost in Million | Remarks |
850 | CONSTRUCTION OF WSS (SOLAR ) AT HINDU MOHALA KHUZDAR | 20 | Work In Progress |
851 | CONSTRUCTION MULTIPURPOSE HALLÂ AT HINDU MOHALA KALAT | 15 | Work In Progress |
853 | CONSTRUCTION OF MULTIPURPOSE AT SSD DHAM HUB & WSS AT PAK HUB | 20.00 | Work In Progress |
855 | CONSTRUCTION OF MULTIPURPOSE HALL FOR HINDU COMMUNITY LAKHRA LASBELA | 10 | Completed |
859 | CONSTRUCTION OF TUFF TILE / SEWERAGE AT HINDU MOHALA WADH
RENOVATIONÂ OF CUMMUNITY HALL AT HINDU MOHALA WADH |
10 | Completed |
2225 | ADDITIONALÂ WORK OF MATA MANDIR/SIKH GURDWARA/PANCHAYATI PRAYER HALL BELA | 50.00 | Work In Progress |
2226 | ADDITIONAL WORK OF PANCHAYATI HALL/MATA MANDIR/GURDWARA/KRISHAN PURI LYARI | 60.0 | Work In Progress |
2227 | ADD: CONST: LAL MANDIR/CHRISTAN CHURCH/CHANDNI RELIGIOUS HALL /EXTENTION OF SHAMSHAN GHAT /EXTENTION OF BALMIK MANDIR HUB | 60.00 | Work In Progress |
2228 | RE-CONSTRUCTION OF HOSTEL FOR ZAIRIN/YATRIES AT KALI MATA MANDIR, KALAT | 30.00 | Work In Progress |
2238 | ADDITIONAL WORK OF MANDIR /GURDWARA/PANCHAYATI HALL SONMIANI | 20.0 | Release Awaited |
3677 | CONSTRUCTION FOOTBALL STADIUM AT KILLI MOHAMMAD ALIM WADHÂ DISTRICT KHUZDAR |
16.0 |
completed |
3678 | CONSTRUCTION FOOTBALL GROUND WITH BOUNDARY WALL SONMIANIÂ DISTRICT LASBELLA |
6.00 |
completed |
3708
|
CONSTRUCTION OF FUTSAL STADIUM( WITH MULTI SPORTS TURF ) 02 NOS IN 32 DISTRICTS (TOTAL 64) AT MAHARABAD SURAB | 25.00 | Work In Progress |
3708
|
CONSTRUCTION OF FUTSAL STADIUM( WITH MULTI SPORTS TURF ) 02 NOS IN 32 DISTRICTS (TOTAL 64) AT KALAT | 25.00 | Work In Progress |
3708
|
CONSTRUCTION OF FUTSAL STADIUM( WITH MULTI SPORTS TURF ) 02 NOS IN 32 DISTRICTS (TOTAL 64) AT BUET KHUZDAR | 25.00 | Work In Progress |
3708
|
CONSTRUCTION OF FUTSAL STADIUM( WITH MULTI SPORTS TURF ) 02 NOS IN 32 DISTRICTS (TOTAL 64) AT KANAK MASTUNG | 25.00 | Work In Progress |
3708
|
CONSTRUCTION OF FUTSAL STADIUM( WITH MULTI SPORTS TURF ) 02 NOS IN 32 DISTRICTS (TOTAL 64) AT JHAL JAWA | 25.00 | Work In Progress |
3708
|
CONSTRUCTION OF FUTSAL STADIUM( WITH MULTI SPORTS TURF ) 02 NOS IN 32 DISTRICTS (TOTAL 64) AT SAKRAN BELA | 25.00 | Work In Progress |
3701 | CONSTRUCTION OF MINI SPORTS COMPLEXES IN 12 DENSELY POPULATED DISTRICT INITIALLY (AT WADH KHUZDAR) PSDP NO. 3701 | 150.00 | Work In Progress |
3701
|
CONSTRUCTION OF MINI SPORTS COMPLEXES IN 12 DENSELY POPULATED DISTRICT INITIALLY (AT DHAM LASBELA ) PSDP NO. 3701 | 150.00 | Work In Progress |
3720 | CONST:& RENOVATION OF JAM GHULAM QADIR CRICKET STADIUM AT HUB DIST, LASBELA | 30.00 | Work In Progress |
3759 | DEVELOPMENT OF MASTER PLAN OF REMAINING 30 DISTRICTS HEAD QUARTERS/TOWNS & HUB TOWN OF BALOCHISTAN | 75.7 M | Work In Progress |
MAKRAN DIVISION | |||
PSDP NO | Name Of Scheme | Approved Cost in Million | Remarks |
88 | CONSTRUCTION OF COMMISSIONER HOUSE AT TURBAT | 64.392 | (Mobilization Advance)
Work in Progress |
92 | CONSTRUCTION OF COMMISSIONER OFFICE COMPLEX AT TURBAT. | 152.392 | (Mobilization Advance)
Work in Progress |
509 | CONSTRUCTION OF ROAD FROM CITY GRAVEYARD TO KECH BRIDGE ROAD VIA CHOGAN E KUND. | 174.331 | (Mobilization Advance)
Work in Progress 17.999 Million Paid to Deputy Commissioner Kech on Account of Compensation |
511 | CONSTRUCTION OF ROAD FROM MALIK ABAD GRAVEYARD TO KOSHKALAT ROAD. | 366.932 | (Mobilization Advance)
Work in Progress 46.535 Million Paid to Deputy Commissioner Kech on Account of Compensation |
512 | CONSTRUCTION OF BLACK TOP LINK ROAD FROM COMMISSIONERY ROAD TO COLLEGE ROAD VIA B&R COLONY. | 143.462 | (Mobilization Advance)
Work in Progress 12.614 Million Paid to Deputy Commissioner Kech on Account of Compensation |
513 | CONSTRUCTION OF ROAD FROM TALEMI CHOWK CAUSEWAY TO GUL E ZAMIN (ROAD WITH RCC DRAIN). | 198.978 | (Mobilization Advance)
Work in Progress 22.397 Million Paid to Deputy Commissioner Kech on Account of Compensation |
514 | CONSTRUCTION OF ROAD FROM SHAHI TUMP MAIN ROAD TO SHAHI TUMP MAIN BAZAR. | 169.575 | (Mobilization Advance)
Work in Progress 16.400 Million Paid to Deputy Commissioner Kech on Account of Compensation |
515 | CONSTRUCTION OF LINK ROAD FROM MAIN ROAD (AGHA KHAN LAB)Â TO CHOGAN E KUND ROAD VIA CHIRIKI LANE AT TURBAT. | 131.137 | (Mobilization Advance)
Work in Progress 16.616 Million Paid to Deputy Commissioner Kech on Account of Compensation |
516 | CONSTRUCTION OF ROAD FROM TMC STREET VIA B&R COLONY TURBAT. | 89.879 | (Mobilization Advance)
Work in Progress 10.838 Million Paid to Deputy Commissioner Kech on Account of Compensation |
2232 | ADDL: CONSTRUCTION/EXTENSION WORK BALMIK/HINDU MANDIR GAWADAR. | 15.00 | Completed |
2239 | ADDL: & EXTENSION WORK BALMIK MANDIR/CHRISTIAN CHURCH TURBAT. | 20.00 | Work in Progress |
3701 | CONSTRUCTION OF MANI SPORTS COMPLEX IN MAND DISTRICT KECH | 148.528 | (Mobilization Advance)
Work in Progress |
3708 | CONSTRUCTION OF FUTSAL STADIUM AT MAND DISTRICT KECH | 25.00 | (Mobilization Advance)
Work in Progress |
CONSTRUCTION OF FUTSAL STADIUM AT BONISTAN DISTRICT PANJGUR | 25.00 | (Mobilization Advance)
Work in Progress |
|
CONSTRUCTION OF FUTSAL STADIUM AT GWADAR TOWN DISTRICT GWADAR. | 25.00 | (Mobilization Advance)
Work in Progress |
|
3715 | SPORTS COMPLEX AND AMMUSEMENT PARK AT KOH-EMEHDI BASE GWADAR. SPORTS DEPTT TO CORDINATE WITH DC | 20.00 | Work in Progress |
3719 | CONST OF STATDIUM AT KUNCHITI DASHT | 30.00 | Completed |
3759 | DEV: OF MASTER PLANS OF REMAINING 30 DISTRICTS HEADQUARTERS/TOWNS & HUB TOWN OF BALOCHISTAN (PACKAGE-6) MAKRAN DIVISION (PANJGUR, PASNI AND JIWANI TOWNS) | 54.00 | 1. Submission of Inspection Report.
2. Submission of Topographic Survey and Digital Base Map of Town. |
3764 | FEASIBILITY STUDY OF MASTER PLANNING OF TUMP CITY DISTRICT KECH | 20.00 | 1. Submission of Inspection Report.
2. Submission of Topographic Survey and Digital Base Map of Town. 3. Submission of Master Plan Report, all Supplementary plans/Maps, drawings illustrations. |
NASEERABAD DIVISION | |||
PSDP NO
ZIP CODE |
Name of Project. | ESTIMATED COST | REMARKS |
2220
 |
EXTENSION AND ADDITIONAL WORK OF HINDU MANDIR/ SIKH GURDWARA AND REMAINING WORKS OF SHAMSHAN GHAT DERA MURAD JAMALI DISTRICT NASEERABAD | 30.00M | WORK IN PROGRESSS |
2219
 |
EXTENSION AND ADDITIONAL WORK BABA GIAN DAS MANDIR/ BAGRI MANDIR/ BILMIK MANDIR/ SIKH GURDWARA DERA ALLAH YAAR | 30.00M |
-do- |
2217
 |
EXTENSION AND ADDITIONAL WORK OF CHURCH USTA MUHAMMAD | 10.00M | WORK COMPLETED |
2218
 |
EXTENSION OF SIKH GURDWARA USTA MUHAMMAD | 20.00M | WORK IN PROGRESS
17.00 M SURRENDERED |
2236
 |
EXTENSION AND CONSTRUCTION OF HINDU MANDIR AND SIKH GURDWARA BHAG DISTRICT KACHHI | 30.00M | WORK IN PROGRESS |
2222
 |
CONSTRUCTION OF HOSTEL FOR ZAIREEN/ YATRIES AT GOBINDHAM KOLPUR DISTRICT KACHHI | 50.00M | WORK IN PROGRESS |
2221
 |
REMAINING WORK/ ADDITIONAL CONSTRUCTION OF HINDU MANDIR MITHRI DISTRICT KACHHI | 10.00M | WORK COMPLETED |
2231
 |
ADDITIONAL WORK PANCHAYAT PRAYER HALL/ MANDIR/ SHAMSHAN GHAT DHADAR DISTRICT KACHHI | 20.00M | WORK COMPLETED |
2230
 |
EXTENSION WORK OF GURDWARA/ MANDIR/ SHAMSHAN GHAT MACH DISTRICT KACHHI | 20.00M | WORK IN PROGRESS
10.00 M WAS SURRENDERED |
2215
 |
ADDITIONAL WORK OF OLD PRAYER (PANCHAYATI)Â Â HALL JHAL MAGSI. | 30.00M | WORK IN PROGRESS |
2216
 |
CONSTRUCTION OF BOUNDARY WALL, ADDITIONAL PRAYER HALL, SHAMSHAN GHAT DISTRICT JHAL MAGSI | 10.00M | WORK COMPLETED |
2235
 |
ADDITIONAL WORK OF MATA MANDIR BOUNDARY WALL GANDAWAH DISTRICT JHALL MAGSI
|
10.00M | WORK COMPLETED |
2237
 |
CONSTRUCTION OF HINDU PANCHIAT HALL & BOUNDARY WALL GANDAWAH DISTRICT JHAL MAGSI | 10.00M | WORK IN PROGRESS |
3590
 |
ESTABLISHMENT OF TECHNICAL TRAINING INSTITUTE IN DARUL-AMAN D.M JAMALI DISTRICT NASEERABAD | 17.50M | WORK IN PROGRESS |
3590
 |
ESTABLISHMENT OF TECHNICAL TRAINIG INSTITUTE IN REHABILITATION CENTER FOR DRUGS ADDICTS D.M JAMALI DISTRICT NASEERABAD | 17.50M | WORK IN PROGRESS |
3708
 |
CONSTRUCTION OF FUTSAL STADIUM WITH MULTI SPORTS TRUFF GANDAKHA DISTRICT JAFFARABAD | 25.00M | -do- |
3708
 |
CONSTRUCTION OF FUTSAL STADIUM WITH MULTI SPORTS TRUF JAINI DISTRICT SOHBATPUR | 25.00M | -do- |
3708
 |
CONSTRUCTION OF FUTSAL STADIUM WITH MULTI SPORTS TRUFF MANJOSHORI DISTRICT NASEERABAD | 25.00M | -do- |
3708
 |
CONSTRUCTION OF FUTSAL STADIUM WITH MULTI SPORTS TRUF MISHKAF DISTRICT KACHHI | 25.00M | -do- |
3708
 |
CONSTRUCTION OF FUTSAL STADIUM (WITH MULTI SPORTS TURF) AT GANDAWA DISTRICTS JHAL MAGSI
|
25.00M | -do- |
3701
 |
CONSTRUCTION OF MINI SPORTS COMPLEXES IN 12 DENESLY POPLUATED DISTRICT INITIALYÂ USTA MUHAMMAD | 150.00M |
-do- |
3775 | CONSTRUCTION OF B/T ROAD FROM PATFEEDAR CANAL TO VILLAGE HAJI ABDUL REHMAN,MOHD AKBAR & KARIM BANGULZAI DISTRICT NASEERABAD | 30.00M | WORK COMPLETED |
3776 | CONSTRUCTION OF B/T ROAD AT VILLAGE SAEED AHMED,AZIZULLAH&MOHD YAQOOB TEHSIL BABA KOT DISTRICT NASEERABAD | 40.00M |
-do- |
3773
 |
IMPROVEMENT/REHABILATATION OF B/T RAOD VILLAGE MEHWA KHAN LEHRI DISTRICT JAFFARBAD | 40.00M |
WORK IN PROGRESS |
RAKHSHAN DIVISION | |||
PSDP NO | Name of Scheme | Approved Cost in Million | Remarks |
2214
|
ADDITIONAL WORK OF CATHOLIC CHRUCH DALBANDIN PSDP NO. | 10.00 | Work in Progress
2.0 M surrender |
2233
|
EXTENSION WORK B/WALL/ PRAYER HALL /SHAMSHAN GHAT NOKUNDI PSDP 2213 | 15.00 | Work in Progress
5.0 M surrender |
3688
|
CONSTRUCTION OF FUTSAL AT KILLI SUBADAR IBRAHIM BADANI DISTRICT NUSHKI PSDP NO. 3688 | 25.00 | Work in progress |
3701
|
CONSTRUCTION OF MINI SPORTS COMPLEXES IN 12 DENSELY POPULATED DISTRICT INITIALLY (NUSHKI TOWN) PSDP NO. 3701 | 150.00 | Mobilization Advance |
3701
|
CONSTRUCTION OF MINI SPORTS COMPLEXES IN 12 DENSELY POPULATED DISTRICT INITIALLY (KHARAN TOWN) PSDP NO. 3701 | 150.00 | Mobilization Advance |
3708
|
CONSTRUCTION OF FUTSAL STADIUMS (WITH MULTI SPORTS TURF) 02 NOS IN 32 DISTRICTS (TOTAL 64) PSDP NO. 3708 ONE AT SARAWAN KHARAN | 25.00 | Mobilization advance |
3708
|
CONSTRUCTION OF FUTSAL STADIUMS (WITH MULTI SPORTS TURF) 02 NOS IN 32 DISTRICTS (TOTAL 64) PSDP NO. 3708 ONE AT QADIRABAD NUSHKI | 25.00 | Mobilization Advance |
3708
|
CONSTRUCTION OF FUTSAL STADIUMS (WITH MULTI SPORTS TURF) 02 NOS IN 32 DISTRICTS (TOTAL 64) PSDP NO. 3708 ONE AT TAFTAN CHAGAI | 25.00 | Mobilization Advance |
3708
|
CONSTRUCTION OF FUTSAL STADIUMS (WITH MULTI SPORTS TURF) 02 NOS IN 32 DISTRICTS (TOTAL 64) PSDP NO. 3708 ONE AT BESIMA WASHUK | 25.00 | Work in Progress
|
3718
|
COMPLETION OF ALREADY 70% BUGTI STADIUM AT KHARAN PSDP NO. 3718 | 153.84 | Work in progress Mobilization Advance |
3759
|
DEV: OF MASTER PLANS OF REMANING 30 DISTRICTS HEAD QUARTERS/TOWN & HUB TOWN OF BALOCHISTAN
PACAKAGE -7 RAKHSHAN DIVISION (KHARAN, NUSHKI, WASHUK) |
40.00 | WORK AWARDED (Survey of Basima at Kharan is completed) |
SIBI DIVISION | |||
PSDP NO | Name of Scheme | Approved Cost in Million | Remarks |
2223 | Additional work of old Balmik Mandar Sibi | 15.00 | Work in Progress |
2224 | Extension of old Lal Gi Mandar/Mata Mandar Lehri | 20.00 | Work in Progress |
3587 | Completion of Rmaining Work at Special education Complex Sibi | 30.00 | Work in progress |
3708 | Construction of Futsal Stadium at Lehri (with Multi Sports Turf) | 25.00 | Work in progress |
3708 | Construction of Futsal Stadium at Dera Bughti Town (With Multi Sports Turf) | 25.00 | Work in progress |
3708 | Construction of Futsal Stadium at Harnai (With Multi Sports Turf) | 25.00 | Work in progress |
3708 | Construction of Futsal Stadium at Tumboo Kohlu (With Multi Sports Turf) | 25.00 | Work in progress |
3708 | Construction of Futsal Stadium at Cheena Ziarat(With Multi Sports Turf) | 25.00 | Work in progress |
3778 | Cutting Blasting Culvert and Structural Work in Safaid to Thukro | 10.00 | Work in completed |
3779 | Construction of Balck Top Road at Seer Nadi to Shamsabad & Kamalzai (2Km) | 20.00 | Work in completed |
Construction of Black Top Road Mizari Chowk to Mall Gishkori | 110.550 | Work in completed | |
3759 | Development of Master Planning Remaining 32 District HQ/Town & Hub Town (Package 5 Sibi Division) | 55.00 | Work in Progress |
3766 | Implementation of Master Planning in the towns of Sibi Division | 500.00 | Tendering in Process |
3701 | Construction of Mini Sports Complex at Lehri | 150.00 | Work in Progress |
3749 | Rehabilitation and Renovation of Exhibition Sibi | 49.130 | Work in Progress |
2391 | Construction of 6 Number of Check Posts (Sibi) | 5.000 | Tendering Process |
2246 | Construction of Black Top Road Killi Wazir Khan Sumrani | 10.00 | Work in Progress |
2246 | Construction of Black Top Road Killi Mir Noor Ahmed Kohlu | 20.00 | Work in Progress |
2246 | Construction of Black Top Road Barli to Nisu Kohlu | 60.00 | Work in Progress |
2246 | Construcion of Black Top Road Mula Khawaja Muhammad to Master Saleem Lalkani | 10.00 | Work in Progress |
2246 | Construction of Black Top Road Killi Master Muhammad Din to Silachi |
10.00 | Work in Progress |
2246 | Provision of Solar System in Various Masjid in Kohlu | 20.00 | Work in Progress |
2246 | Construction of Black Top Road Killi Mir Hamza and Mir Perveez | 10.00 | Work in Progress |
2246 | Construction of Black Top Road Geeri District Kohlu | 50.00 | Work in Progress |
2246 | Cutting Blasting Road Sufaid Takrav to Sandvani Kohlu | 80.00 | Work in Progress |
ZHOB DIVISION | |||
PSDP NO | NAME OF SCHEME | APPROVED COST | REMARKS |
3759 | DEVELOPMENT OF MASTER PLANS OF REMAINING 30 DISTRICTS HQS/ TOWNS AND HUB TOWNS OF BALOCHISTAN | 525.00 | Feasibilities in progress in all the towns |
SPORTS (ONGOING) | |||
6606 | CONSTRUCTION OF FUTSAL STADIUM AT BADINZAI ZHOB WITH MULTI SPORTS TURF) | 25.00 | Work in Progress |
CONSTRUCTION OF FUTSAL STADIUM AT QUETTA ROAD LORALAIÂ WITH MULTI SPORTS TURF) | 25.00 | Work in Progress | |
CONSTRUCTION OF FUTSAL STADIUM AT RAKHNI BHARKAN WITH MULTI SPORTS TURF) | 25.00 | Work in Progress | |
CONSTRUCTION OF FUTSAL STADIUM AT DRUG MUSAKHAIL WITH MULTI SPORTS TURF) | 25.00 | Work in Progress | |
CONSTRUCTION OF FUTSAL STADIUM AT OLD TOWN SHERANI WITH MULTI SPORTS TURF) | 25.00 | Work in Progress | |
CONSTRUCTION OF FUTSAL STADIUM AT VAILA DUKKI WITH MULTI SPORTS TURF) | 25.00 | Work in Progress | |
CONSTRUCTION OF FUTSAL STADIUM AT MUHALLAH BYPASS, TOWN WITH MULTI SPORTS TURF) | 25.00 | Work in Progress | |
6599 | CONSTRUCTION OF MINI SPORTS COMPLEXES IN 12 DENESLY POPLUATED DISTRICT MURGHA FAQEERZAI | 150 M | Problems regarding Availability and feasibility of land from local people and Security issues for the officials |
CONSTRUCTION OF MINI SPORTS COMPLEXES IN 12 DENESLY POPLUATED DISTRICT BORI BAZZAR LORALAI | 150 M | Availability of land | |
CONSTRUCTION OF MINI SPORTS COMPLEXES IN 12 DENESLY POPLUATED DISTRICT MINA BAZAAR ZHOB | 150 M | Local people are creating problems and also Status quo regarding this village lands has been given by Court. | |
6604 | CONST: & REMAINING WORK OF CRICKET STADIUM AT TOWN, KILLA SAIFULLAH | 20.00 | Work in Progress
An amunt of 10 M was released by finance Department, A sum of 6.7 million was demanded in Excess but instead of excess 4.5 Million was withdraw by P&D without any Surrender Letter by undersigned office. |
6744 | ESTAB: OF MASTER JOHNSON ASHRAF MEMORIAL PRIMARILY HEALTH CENTER & CONST: BOUNDARY WALL / DEV: WORK AT CHRISTIAN COLONY LORALA | 10.00 | Under tendering process, The Amount is yet to Release from Finance Department. |
Minority Sector | |||
3930 | CONST: OF MATAÂ ASTHAN/PRAYER HALL MINORITY COLONY AT KILLI JAHANGIR KILLA SAIFULLAH | 20.00 | Under tendering process, The Authorize 10 Million Amount is yet to Release from Finance Department. |
2240 | ADDITIONAL WORK OF CHRISTIAN GRAVEYARD/SHAMSHAN GHAT/CHRISTIAN CHURCH, LORALAI. | 15.00 | Work Completed |
Provincial Transport Authority Sector | |||
4136 | CONST OF 6 NUMBER OF CHECK POSTS | 30.00 M | Under tendering process and waited for funds to be Released. |
CONST OF 6 NUMBER OF CHECK POSTS Zhob divison at killa Saif ullah | 5.0 M | Under tendering process and waited for funds to be Released. | |
NEW SCHEMES | |||
PSDP NO | NAME OF SCHEME | APPROVED COST | REMARKS |
6770 | CONSTRUCTION OF B/T ROAD AT WADERA ASGHAR PIRDADANI AND B/T ROAD AT MIR HAZAR WADH- DISTRICT KOHLUDISTRICT KOHLU | 12.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6771 | CONSTRUCTION OF BLACK TOP ROAD, SEWERAGE LINE & TUFF TILE AT MOHABAT ABAD – DISTRICT KOHLU | 10.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6772 | CONSTRUCTION OF BLACK TOP ROAD, SEWERAGE LINE & TUFF TILE AT MARRI COLONY – DISTRICT KOHLU | 20.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6773 | CONST B/T ROAD,SEWERAGE
,TUFF TILE AT KILLI SAMAND KHAN SHAHIJA,WAHID,MIR TAMOUR KHAN,MULLA MORAN,SHAH NAWAZ ZARKON,HAJI QADIR ZARKON KOHLU |
15.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6774 | LYING OF TUFF TILE AT HUB CITY CRICKET STADIUM | 20.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6775 | CONST OF B/T ROAD RASOOL SHAHIJA, SHER KHAN SHAHIJA, KILI FAIZ MUHAMMAD, MURAD BAKHSH, BAHAR KHAN, JALAL KHAN SHAHIJA ABAD DIST KOHLU | 10.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6776 | CONST OF B/T ROAD KILLI BLUND KHAN, AKHTAR MUHAMMAD, SOHBAT KHAN BOHRI & SHER MUHAMMAD MODEL TOWN DIST KOHLU | 14.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6777 | CONSTRUCTION OF BLACK TOP ROAD KILLI MIAN KHAN, KILLI PAWADI TOMBALI PATTI – DISTRICT KOHLU | 10.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6778 | CONSTRUCTION OF BLACK TOP INTERNAL ROAD U/COUNCIL SADDAR, KARAM KHAN SHAHR, TAMBOO & MAIWAND-DISTRICT KOHLU | 60.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6779 | CONSTRUCTION OF SEWERAGE LINE & TUFF TILE IN MARRI BAZAR- DISTRICT KOHLU | 10.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6780 | CONSTRUCTION OF SEWERAGE LINE & TUFF TILE NEW KILLI- DISTRICT KOHLU | 30.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6781 | CUTTING / BLASTING OF ROAD SHAH FASIL JANDHRAN TO KOCH /DADA SHAH MUHAMMAD – DISTRICT KOHLU | 14.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6782 | CONSTRUCTION OF B/TOP ROAD AFZAL KHAN TO NIAZ CHOORMI, MALIK SHAH NAWAZ TO KILLI FAIZO CHOORMI –DISTRICT KOHLU | 15.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6783 | CONST: OF B/TOP MAIN ROAD TO KILLI BAHADUR SHAH ZARKOON, YOUSUF ORYANI DISTRICT KOHLU | 12.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6784 | REHABILITATION AND ADDITIONAL WORKS, BATHROOM, TAILS, SANITARY WORK OF MANDIR MITHRE, DISTRICT BOLAN | 10.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6785 | REHABILITATION AND ADDITIONAL WORK OF UDERO LAL / THAN SAAB MANDIR DHADAR, KACHI | 10.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6786 | REHABILITATION AND ADDITIONAL WORKS OF BABA GURMUKH DARBAR, CITY USTA MUHAMMAD, DIST: JAFFARABAD | 10.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6787 | SUPPPLY INSTALLATION OF ULTRA FILTRATION PLANTS WITH SOLAR SYSTEM OF 10 VILLAGES | 50.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6788 | PROVISION AND INSTALLATION OF HOME SOLAR SYSTEM IN TOTAL NO,S 500 SETS FOR TEHSIL GICHKDRAKOP DISTRICT PANJGUR | 50.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6789 | CONSTRUCTION OF B/T ROAD AT VARIOUS VILLAGES OF TEHSIL MACH, DISTRICT KACHHI | 150.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6790 | CONSTRUCTION OF COMMUNITY BASED SOLAR WATER SUPPLY SCHEMES AT VARIOUS VILLAGES OF TEHSIL MACH | 90.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6791 | INSTALLATION OF SOLAR STREET LIGHTS FOR CHUKI, SHAMBANI, BUJERANI, ADMANI AND AKBARABAD DISTRICT JHAL MAGSI | 25.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6792 | INSTALLATION OF SOLAR STREET LIGHTS FOR JHAL MAGSI CITY DISTRICT JHAL MAGSI | 18.500 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6793 | RECONDITIONING OF B/T ROAD FROM M-8 TO KACHI JADDED DISTRICT JHAL MAGSI | 47.502 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6794 | CONSTRUCTION OF B/T ROAD AND FIXING OF TUFF TILES AT JHAL MAGSI CITY DISTRICT JHAL MAGSI | 50.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6795 | CONSTRUCTION OF B/T ROAD & SOLAR STREET LIGHTS VILLAGE MIR ASGAR DISTRICT KACHHI. | 40.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6796 | REHABILITATION AND ADDITIONAL WORKS OF NANGHA BABA AT BAGH KACHI | 10.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
6797 | CONST/REH OF BLACK TOP ROAD FROM MOLVI QADIR BAKSH TO WARDS MANJHI PUR (3.00KM) SOHBATPUR | 35.000 | PC-I will be submitted by the mid or end of July to be placed for DSC meeting |
Worthy Secretary UP&DD, Mr. Manzoor Ahmed Zehri, Director works Mujtaba Ahmed Baloch and XEN Mekran Division, Mr. Shoaib Saeed.Visiting different Development Schemes of Mekran Division
SECRETARY UP&DD, MANZOOR AHMED ZEHRI VISITED NASEERABAD DIVISION SCHEMES CONST: OF TREATMENT AND RE-HABILITATION COMPLEX FOR DRUG ADDICTS DISTRICT NASEERABAD PSDP NO. 3581
SECRETARY UP&DD, MANZOOR AHMED ZEHRI
VISITED KALAT DIVISION SCHEMES
CONSTRUCTION OF FOOTBALL STADIUM AT KILLI MOHAMMAD ALAM WADH DISTT: KHUZDAR PSDP NO. 3677
S# | DIVISION | CONTACT NO FAX NO | |
1 | Secretary | – | 0812-9203305
FAX: 0812-9202883 |
2 | Director Works | directorworks9@gmail.com | 0333-7887479
FAX: 0812-9211903 |
3 | Quetta Division | xenquettaqa7377@gmail.com | 0333-7859886 |
4 | Zhob Division | exnurbanloralai@gmail.com | 0313-3576776 |
5 | Kalat Division | xenupddkhzdr@gmail.com | 0333-7772177 |
6 | Rakhshan Division | engrhabibkhan@yahoo.com | 0333-7973913 |
7 | Naseerabad Division | janzaib78@gmail.com | 0333-7871887 |
8 | Sibi Division | e.eupddsibi4201@gmail.com | 0333-7758821 |
9 | Makran Division | engineershoaibgichki@gmail.com | 0311-0187771 |
10 | Chief Planning & Monitoring Unit | Kaleemadv31@gmail.com | 0333-7754677 |